PDA

View Full Version : Max power supply to be replaced today


12Wonder
April 8th, 2005, 02:54 PM
The techs at the data center are going to swap out the power supply on max server today. Downtime is expected to be about 10 minutes. Doing the switch at night time is not an option, as the night crew is full up on jobs so it can only really be done during the day shift when the most techs are around.

Sorry for any inconvenience.

Anne